Detailed engineering for a number of departments at the Mother and Child Perinatal Centre

26 March 2020

We were tasked with bringing the ventilation and air conditioning system at the perinatal centre up to the highest modern international standards, with a particular focus on the IVF department, one of the most high-tech areas of the entire group of medical facilities. We were tasked with bringing the ventilation and air conditioning system of the perinatal centre up to the most modern international standards, with a particular focus on the IVF department, as one of the most high-tech areas of the entire group of medical institutions.

The result of our work was energy-efficient and highly compact air conditioning units, including highly efficient recovery systems with complete separation of air flows, equipped with fans with EC motors, a low-noise refrigeration machine with smooth capacity control, and a complex control system that allows for the organisation of night and day operating modes in operating rooms and clean rooms in all departments entrusted to us.

The work on developing the ventilation and air conditioning design solution for the perinatal centre was carried out not only in full compliance with GOST R 52539-2006, SP 158.13330.2014 and SanPiN 2.1.3.2630-10, but, more importantly, the system meets the highest international standards, such as ONORM H6020, VDI 2083 and DIN 1946.

The implementation of such projects demonstrates the comprehensive work of ClimaTech, from the development of a design solution to the subsequent production of equipment that takes into account all possible nuances of the project and its subsequent commissioning at the facility.

ПРЕДУПРЕЖДЕНИЕ

Перед копированием материалов сайта просим ознакомиться с нашими правилами!

C правилами ознакомлен