Detailed engineering and supply of equipment for Uralelectromed JSC, Verkhnyaya Pyshma

Copper electrolysis. Second stage.

  • Intermediate heatexchangers, each with a capacity of 3000 kW,
  • Control cabinets in stainlesssteel enclosures
  • Air flow rate of each fan from 60,000 to 90,000 m³ /h
  • Fans coated with epoxyresins and painted
  • Air flow through a single TO unit 180,000 m³ /h, fullycopper construction, coated with epoxy resins

Interestingfactsabout the second stage of CEM

  • Construction Triumph 2018, Nomination: Best Industrial Facility in the Sverdlovsk Region
  • Total system capacityis over 20,000 kW of thermal energy
  • Total amount of glycolsolution is over 80 tonnes
  • Pipeline lengthis approximately 10 km.
  • Total air flow of the system exceeds 2,200,000 m³ /h.
  • The recovery system willsave over 12,000 kW (approximately the amount of heat required to heat an area of Moscow with a population of 500,000 people).