As part of the reconstruction of the surgical department of City Clinical Hospital No. 23 named after I.V. Davydovsky City Clinical Hospital No. 23, our company developed the main technical solutions for the air conditioning system, carried out detailed engineering, and developed very compact and energy-efficient TWH central air handling systems, including a TW-V series chiller with refrigeration circuit redundancy and special TW-F series fan coils.
Subsequently, we supervised the installation at the facility and assisted with commissioning the system.
The surgical department of the City Clinical Hospital was equipped with a modern ventilation and air handling system that meets all the requirements of DIN 1946 Part 4, ONORM H 6020, VDI 2083, GOST R ISO 14644 and GOST R 52539-2006.
Clean areas are served by air conditioning units with year-round temperature and humidity control.
The entire clean area, angiography unit, and operating theatre are equipped with high-efficiency air filtration.
The ward and doctors’ offices are equipped with hygienic fan coils.
A particular point of pride in the project is the main operating room of the department, where we installed a 9 m² laminar ceiling without reusing exhaust air (recirculation), which is especially challeging under renovation conditions.
The body and end nozzles of the ceiling are made of stainless steel. A touch control panel is provided inside the operating room.
The entire air treatment system provides a complete dispatching system, and a specially designed refrigeration unit can be controlled remotely.
